The project consists of furnishing all labor, materials and equipment necessary for the installation of an above-ground prefabricated water booster pump station as specified and as indicated on the Drawings, including but not limited to the following: coordination of and connection to water main installed by others, sprinkler system for the prefabricated pump station, earthwork, concrete foundation pad, infiltration basin, sediment forebay and overflow, paving, site fencing and access gate, restoration, utility crossings, and all miscellaneous work and cleanup as specified or required to complete the work. The pump station shall be a pre-engineered, factory-built system complete with pumps, variable frequency Drives, interior piping, valves, fittings, electric wiring, heater, lights, meters, flow and pressure monitoring devices, exhaust fans, instrumentation and electrical components, chemical rooms, and all else incidental thereto. The complete, fully factory tested unit shall be provided ready for connection to site utilities when delivered to the job site