HARDWICK, MA

Hardwick, MA Water Pollution Control Facility Project 2A

The work at the WPCF consists of a new headworks building with influent screening system and washer compactor, replacement of existing influent pumping system, replacement of existing SBR decanter mechanism and aeration/mixing system, new mixing/aeration system in existing sludge holding tank, new disc-filter effluent filtration unit and UV disinfection system in new building, replacement of plant water system, existing building architectural upgrades     instrumentation and control/SCADA system modifications, electrical upgrades and modifications to the existing main electrical gear, site restoration and paving.  The work also includes conversion of an existing remote ejector station into a submersible pump station.